In February 2023, the Batari Energy team successfully installed a solar power system (PLTS) at BintangPlus, a lighting store in Bengkulu, featuring a capacity of 5,500 Wp and a 12,500 Wh battery. This project is part of Batari Energy's ongoing efforts to expand access to renewable energy across Indonesia.
BintangPlus had previously faced challenges regarding high and unstable electricity costs. By installing the solar power system, Batari Energy aims to help reduce electricity expenses and improve the quality of service at the store.
The installation process went smoothly and was completed in just a few days. The Batari Energy team collaborated closely with the store owner to ensure the system was installed correctly and safely. With the solar power system now in place, BintangPlus enjoys more stable and affordable energy access. Furthermore, the installation helps reduce greenhouse gas emissions and supports the development of renewable energy in Indonesia.
Batari Energy remains committed to expanding renewable energy access throughout the country. Through this project, the team hopes to inspire the community to switch to renewable energy and support the development of cleaner, more sustainable energy solutions.
Thus, the installation of this solar power system by Batari Energy marks a significant step toward increasing renewable energy access in Indonesia, particularly in Bengkulu. We look forward to continuing our collaboration with the community to build a more sustainable future.